General Information
Provider
CyrusOne
Colo Space
90,363 SF
Airport
N/A
Year Built
2018
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Not Available
Overview
This CyrusOne facility is located at Leonhard-Heißwolf-Str. 4 in Frankfurt. The 90,363 SF purpose built facility is designed to meet customer colocation needs. To ensure continuity of service, the facility maintains N+1 generator redundancy.
Certifications
ISO
Uptime Institute M&O
Uptime Tier III (Constructed Facility)
Uptime Tier III (Design)
Power & Infrastructure
Utility Feeders
Dual Feed
UPS
Minimum N+N UPS with 10-minute battery back-up as standard (2N)
Standby Power
N+1
Cooling
N+1
