General Information
Provider
CyrusOne
Colo Space
930,000 SF
Airport
N/A
Year Built
N/A
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Not Available
Overview
CyrusOne is under construction with a new data center. The total building size is expected to finish out at 930,000 SF, but only a portion of that will be used as critical space for servers. Infrastructure redundancies are expected to come in at N+1/2N for generators, N+1 for cooling, and N+1/2N for UPS. The data center is designed to meet HIPAA, ISO and FISMAS standards.
Certifications
SSAE 18
PCI DSS
ISO
FISMA
SOC 1
SOC 2
Power & Infrastructure
Utility Feeders
Dual Feed
UPS
750kVa Mitsubishi UPS systems; each power leg has a dedicated UPS with battery backup (N+1/2N)
Standby Power
N+1/2N
Cooling
N+1