General Information
Provider
CyrusOne
Colo Space
420,000 SF
Airport
N/A
Year Built
2013
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Available
Overview
CyrusOne operates this data center in Durham, located at 2223 NE Creek Parkway. Designed to deliver 420,000 total SF, CyrusOne has currently commissioned 14,250 kW at the purpose built facility. AT&T, Time Warner Cable and CenturyLink are some of the fiber options available at DUR1. UPS systems are configured in N+2 redundancy with N+2 generators and N+2 cooling.
Certifications
SSAE 16
PCI DSS
ISO
FISMA
FedRAMP
SOC 2
Uptime Tier III (Constructed Facility)
Uptime Tier III (Design)
Power & Infrastructure
Utility Feeders
Dual Feed
UPS
1.2 MW UPS modules (Toshiba/Mitsubishi); 24 x Static Transfer Switch's with Reserve Duel Module UPS's total redundancy at 1.5 MW on every Emergency Busway (N+2)
Standby Power
N+2
Cooling
N+2
Other Information
Network Providers
Level 3 (Lumen Technologies), AT&T, CenturyLink (Lumen), XO Communications, Time Warner Telecom, Time Warner Cable