General Information
Provider
Switch
Colo Space
1,363,451 SF
Airport
N/A
Year Built
2016
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Not Available
Wholesale
Available
Interconnectivity
Not Available
Overview
The Citadel Campus located in Tahoe Reno, Nevada, will have a capacity of up to 17.4 million square feet of data center space and up to 850 MW of power upon completion, making it the world’s largest colocation data center campus. Switch’s Tier 5® Platinum facilities, combined with hyperscale purchasing power, makes Switch the highest-rated and most cost-effective colocation environment in the industry.
Certifications
SSAE-16
PCI
FISMA
FEDRAMP
NIST
SOC 1
SOC 2
SOC 3
Power & Infrastructure
Power Density
AC and or DC power available, flat rate or based on usage
Utility Feeders
N/A
UPS
Dual Feed (2N, null)
Standby Power
2N (Varies by location)
Cooling
2N+1 (Varies by location)
Flood Zone
N/A
Seismic Rating
N/A
Fire Suppression
Varies by location
Fire Detection
Varies by location
Amenities
- Private Suites
- Dedicated Infrastructure
- CCTV
- Card Key Access
- Man Trap
- Perimeter Fencing
Other Information
Network Providers
NULL
Media
No media available.