General Information
Provider
CyrusOne
Colo Space
9,000 SF
Airport
N/A
Year Built
N/A
Security
On-site
Uptime
99.999%
Hyperscale
Not Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Available
Overview
CyrusOne MIL1 is a brand-new state of-the-art data center strategically located on a 74,866 sqm (18.5 acre) site in the Municipality of Segrate, East Milan, at the gateway between Italy, Europe and the Mediterranean basin. The facility will initially deliver 27 MW of IT capacity to 9,000 sqm of world class technical space within a single building over three floors with a total of three 9 MW data halls.
Certifications
Power & Infrastructure
Power Density
9 MW per hall
Utility Feeders
Mains power supplied via 100% rated A&B 220 kV incomers diversely routed active / active with a capacity of 100 MVA
UPS
Block redundant UPS topology with 1500kW UPS system per power stream (N+1)
Standby Power
Fully rated block redundant LV back-up generators with 48-hour fuel autonomy, capable of continuous running (N+1)
Cooling
N+1 free cooling air cooled chillers, Critical cooling distributed via multiple pipework rings per data hall (N+1 (chillers), N+2 (CRAH units))
Flood Zone
N/A
Seismic Rating
N/A
Fire Suppression
Nitrogen filled pre-action sprinkler system to data halls and MMR's
Fire Detection
VESDA (Very Early Smoke Detection Apparatus) for early warning, and double-interlock fire suppression systems in critical spaces
Amenities
- Secure managed delivery bay with goods lift
- Mantraps with biometric readers into data halls
- Electric vehicle charging stations
Other Information
Network Providers
Carrier neutral access and diverse fibre connectivity to active A&B Meet-Me-Rooms from multiple telecommunications providers, Four diverse fibre routes onto site, Diverse fibre rings around entire facility to permit multiple building/hall connectivity
Media
No media available.