Skip to main content

General Information

Provider

H5 Data Centers

Colo Space

452,300 SF

Airport

N/A

Year Built

Available in 2025

Security

On-site

Uptime

100% uptime SLA

Hyperscale

Not Enabled

Retail

Not Available

Wholesale

Not Available

Interconnectivity

Available

Overview

H5’s Quincy II & III data center campus spans 452,300 SF across 63 acres, offering scalable colocation and powered shell solutions. It provides some of the lowest-cost power in the U.S., with renewable hydroelectric energy sourced from two nearby Columbia River dams. The facility benefits from Washington State tax incentives and a Tier III, concurrently maintainable design, ensuring optimal efficiency and compliance.

Certifications

SOC audits
ISO certifications

Power & Infrastructure

Power Density

N/A

Utility Feeders

Two on-site power substations totaling up to 82 MVA

UPS

N/A

Standby Power

N/A

Cooling

Chilled water-based mechanical system

Flood Zone

N/A

Seismic Rating

N/A

Fire Suppression

N/A

Fire Detection

N/A

Amenities

  • Dual-factor authentication and access controls
  • 24x7 security personnel
  • 24x7 camera surveillance with 90-day data retention
  • Personnel background checks (U.S. citizens)
  • No sales tax on computer equipment
  • One of the lowest power costs in the U.S. (<$0.035/kWh)

Other Information

Network Providers

Carrier-neutral colocation, Diverse fiber entry points, Supports air or water-cooled deployments

Media

No media available.

Contact Quincy II & III Campus

Complete the form to get your information reviewed by Quincy II & III Campus