General Information
Provider
H5 Data Centers
Colo Space
452,300 SF
Airport
N/A
Year Built
Available in 2025
Security
On-site
Uptime
100% uptime SLA
Hyperscale
Not Enabled
Retail
Not Available
Wholesale
Not Available
Interconnectivity
Available
Overview
H5’s Quincy II & III data center campus spans 452,300 SF across 63 acres, offering scalable colocation and powered shell solutions. It provides some of the lowest-cost power in the U.S., with renewable hydroelectric energy sourced from two nearby Columbia River dams. The facility benefits from Washington State tax incentives and a Tier III, concurrently maintainable design, ensuring optimal efficiency and compliance.
Certifications
Power & Infrastructure
Power Density
N/A
Utility Feeders
Two on-site power substations totaling up to 82 MVA
UPS
N/A
Standby Power
N/A
Cooling
Chilled water-based mechanical system
Flood Zone
N/A
Seismic Rating
N/A
Fire Suppression
N/A
Fire Detection
N/A
Amenities
- Dual-factor authentication and access controls
- 24x7 security personnel
- 24x7 camera surveillance with 90-day data retention
- Personnel background checks (U.S. citizens)
- No sales tax on computer equipment
- One of the lowest power costs in the U.S. (<$0.035/kWh)
Other Information
Network Providers
Carrier-neutral colocation, Diverse fiber entry points, Supports air or water-cooled deployments
Media
No media available.
