Data Center Map Colocation Bare Metal Facilities Regions Providers Quotes Contact

General Information

Overview

CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin at 172,000 total square feet of shell and offering 120,000 colocation square feet (CSF), with up to 24MW of power, and over 25,000 square feet of class A office space at full build. Expansive office or work area recovery space is customizable to meet unique requirements of clients for dedicated office suites linked to critical IT operations. The data center's infrastructure combines multiple levels of technology and security, resulting in no single point of failure.

Building Details

Network Providers

Carrier-neutral

Part of CyrusOne National IX (Internet Exchange)

Amenities

No amenities listed

Media

No media available. See CyrusOne Media.

Contact

Complete the form to get in your information reviewed by

Get Started Today

Register Your Email Address with ColoCapacity

[{"_geo": {"lat": 30.1831, "lng": -97.7368}, "amenities": ["Designed to meet TIA-942 requirements for electrical and mechanical", "High Performance Computing (HPC) capable", "Wholesale and retail colocation options", "24/7 year round staffed NOCC and remote hands support", "Dedicated cages and private suite options available", "Worksite recovery: customizable to fit client needs"], "certifications": ["SSAE 18 (SOC I type II)", "PCI DSS (sec 9 \u0026 12)", "HIPAA", "ISO 27001", "FISMA"], "facility": {"address": "7301 Metropolis Drive", "city": "Austin", "connectivity": {"hasHyperscale": true, "hasInterconnect": true, "hasRetail": true, "hasWholesale": true, "networkProviders": ["Carrier-neutral", "Dark-fiber connectivity option", "Part of CyrusOne National IX"]}, "country": "United States", "name": "Austin AUS2 Data Center", "overview": "CyrusOne\u0027s AUS2 data center is located in the Met Center business park, and is the first of an optional four-phase, 288,000 square foot data center campus. Designed to CyrusOne\u0027s power, cooling and security standards, the campus is ideal for production and co-production server environments for national, international and local companies. The facility can accommodate up to 70,000 sq. ft. data center/41,000 colo square feet (CSF), with 3 adjacent land pads available for growth.", "state": "Texas", "stateAbbr": "TX", "url": "/cyrusone-austin-aus2-data-center", "worldRegion": "northamerica", "yearBuilt": "NULL", "zipcode": "78744"}, "hasSecurity": true, "id": 7, "media": ["NULL"], "powerAndCooling": {"cooling": {"configuration": "Utilizing Stultz 70-ton CRAH units with electronically commutated (EC) variable-speed fans; Highly efficient multiple 500 ton Trane chillers with fast restart and adaptive controlled microprocessors", "redundancy": "Redundant closed loop chilled water cooling design"}, "density": "250 wpsf with the ability to support over 1,000 wpsf", "standbyPower": {"configuration": "Scalable 2.25 MW Detroit Diesel dedicated generators pre-wired for additional capacity; 3,300 belly tank and 12,000 gallon external tank", "redundancy": "Batteries are isolated in a different room from the UPS"}, "ups": {"configuration": "Multiple MGE 8000 625kVA UPS systems; each power leg has a dedicated UPS with battery backup", "redundancy": "Multiple levels of redundancy available within same footprint (e.g. N, 2N)"}, "utilityFeeders": "Two 400 MW capacity substations with dual underground, concrete encased feeds from electrical substations"}, "provider": "CyrusOne", "providerId": 7, "providerLogo": "https://colo.nyc3.cdn.digitaloceanspaces.com/logos/cyrusone.avif", "specifications": {"building": {"colocationSpace": 70000, "type": "NULL"}, "fireProtection": {"detection": "Very Early Smoke Detection Apparatus (VESDA) system; sampling air in parts per million", "suppression": "Zonal dual-action interlocking dry-pipe pre-action system"}, "floodAndSeismic": {"floodZone": "NULL", "seismicRating": "NULL"}}, "uptime": "100% uptime service level agreement on power"}]
{"_geo": {"lat": 30.1821, "lng": -97.7361}, "amenities": ["Wholesale and retail colocation options", "24x7 year round staffed NOC and smart hands support", "Dedicated cages and private suite options available", "Worksite recovery: customizable to fit client needs", "Gordon data center ceiling system grid allows hot air to rise off of the data center floor quickly"], "certifications": ["ISO/IEC 27001", "PCI DSS", "HIPAA/HITECH", "FISMA-High", "SSAE 18 (SOC 1 Type II)", "Type 2 AT 101/SOC 2"], "facility": {"address": "7100 Metropolis Drive", "city": "Austin", "connectivity": {"hasHyperscale": true, "hasInterconnect": true, "hasRetail": true, "hasWholesale": true, "networkProviders": ["Carrier-neutral", "Part of CyrusOne National IX (Internet Exchange)"]}, "country": "United States", "name": "Austin AUS3 Data Center", "overview": "CyrusOne\u0027s AUS3 data center is projected to be the company\u0027s largest facility in Austin at 172,000 total square feet of shell and offering 120,000 colocation square feet (CSF), with up to 24MW of power, and over 25,000 square feet of class A office space at full build. Expansive office or work area recovery space is customizable to meet unique requirements of clients for dedicated office suites linked to critical IT operations. The data center\u0027s infrastructure combines multiple levels of technology and security, resulting in no single point of failure.", "state": "Texas", "stateAbbr": "TX", "url": "/cyrusone-austin-aus3-data-center", "worldRegion": "northamerica", "yearBuilt": "NULL", "zipcode": "78741"}, "hasSecurity": true, "id": 422, "media": ["NULL"], "powerAndCooling": {"cooling": {"configuration": "36-inch raised floor design; Utilizing Stulz 200-ton CRAH units with electronically commutated (EC) variable-speed fans; Highly efficient multiple 500-ton Trane chillers with rapid restart and adaptive controlled microprocessors", "redundancy": "Closed loop chilled water cooling design"}, "density": "250 wpsf with the ability to support over 1,000 wpsf", "standbyPower": {"configuration": "Scalable 2.25MW MTU generators dedicated to each power leg - 48-hour belly tank with each generator at full-load", "redundancy": "Containerized power rooms, featuring pre-installed and pre-tested UPS and switchgear equipment"}, "ups": {"configuration": "Multiple Mitsubishi 750kVA/750kW UPS systems; each power leg has two dedicated UPS systems with VRLA battery backup", "redundancy": "Multiple levels of redundancy available within same footprint (e.g. N, 2N, Distributed Redundant)"}, "utilityFeeders": "Two 400MW capacity substations with dual underground, concrete encased feeds from electrical substations"}, "provider": "CyrusOne", "providerId": 7, "providerLogo": "https://colo.nyc3.cdn.digitaloceanspaces.com/logos/cyrusone.avif", "specifications": {"building": {"colocationSpace": 172000, "type": "Polycarbonate wall system that is 10 times stronger than acrylic and 200 times stronger than glass with superior thermal qualities"}, "fireProtection": {"detection": "Very Early Smoke Detection Apparatus (VESDA) system; sampling air in parts per million", "suppression": "Zonal dual-action interlocking dry-pipe pre-action system"}, "floodAndSeismic": {"floodZone": "NULL", "seismicRating": "NULL"}}, "uptime": "100% uptime service level agreement on power"}