Skip to main content

General Information

Provider

Hivelocity

Colo Space

1,100,000 SF

Airport

N/A

Year Built

N/A

Security

On-site

Uptime

100% power uptime

Hyperscale

Not Enabled

Retail

Not Available

Wholesale

Not Available

Interconnectivity

Available

Overview

Hivelocity’s Chicago data center at 350 E Cermak Road is a Tier III facility offering 1.1 million square feet of data center space with 100+ MW of existing capacity. This carrier-neutral facility provides 70+ on-site carriers, cross-connections, 100Gbps ports, and DDoS protection, ensuring optimal connectivity for businesses requiring high availability.

Certifications

SOC 2
SOC 3
PCI-DSS
ISO 27001
LEED Gold
Energy Star

Power & Infrastructure

Power Density

100+ MW existing capacity

Utility Feeders

N/A

UPS

N+1 with some 2N

Standby Power

Diesel generator power redundancy

Cooling

N+1 with some 2N CRAC cooling (N+1)

Flood Zone

N/A

Seismic Rating

N/A

Fire Suppression

Dry pipe dual-interlock pre-action overhead fire suppression system, Gas sub-floor fire suppression system

Fire Detection

Sub-floor leak detection system

Amenities

  • 24/7/365 on-site security team
  • Three-factor authentication for entry
  • Routine preventive maintenance on all critical infrastructure assets
  • 24/7 monitoring of all critical infrastructure assets
  • Gated secure campus access
  • 24/7 motion-activated cameras with 90-day retention
  • Man-trap entrance

Other Information

Network Providers

Carrier-neutral facility with 70+ carriers on-site, Cross-connections available, IRP Premium Blend of Multiple Transit Providers, CenturyLink, Cogent, NTT, Digital Realty Internet Exchange, 100% network uptime since 2020 commissioning, DDoS protected, Noction IRP Routing Protocol, 100Gbps ports available

Media

No media available.

Contact Chicago ORD-1

Complete the form to get your information reviewed by Chicago ORD-1