General Information
Provider
Ascenty
Colo Space
226,000 SF
Airport
N/A
Year Built
2022
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Not Available
Overview
HTL 5 is a colocation facility operated by Ascenty in the São Paulo market. Designed to deliver 226,000 total SF, Ascenty has currently commissioned 25,000 kW at the purpose built facility. Cooling systems are configured in N+1 redundancy.
Power & Infrastructure
UPS
Tribus System – DRUPS (N+1) (N+1)
Cooling
N+1
