Overview
Ashburn VA3 is the third of nine planned data centers on NTT’s 224MW campus, located in the world’s largest data center market. Offering carrier-neutral connectivity, scalable infrastructure, and high-density power options, the facility supports deployments from single cabinets to large-scale custom solutions.
Certifications
Power & Infrastructure
Power Density
16MW total critical IT load
Utility Feeders
34.5kV electrical distribution
UPS
N+2 distributed redundancy with 9 to make 8 design (N+2)
Standby Power
Generators with on-site fuel storage to support 24 hours run time at full load, with 24x7x365 fuel delivery
Cooling
Waterless cooling using pumped refrigerant economizers and condensers, raised floor environment (N+2)
Flood Zone
N/A
Seismic Rating
N/A
Fire Suppression
Dual interlocked nitrogen-filled preaction dry pipe fire suppression system
Fire Detection
Aspirating smoke detection (ASD) system for fast detection and mitigation
Amenities
- Class A office space
- Dedicated long-term storage
- Conference rooms
- Break room
- Crash carts
- Rack and server lifts
- Free Wi-Fi
Other Information
Network Providers
Carrier-neutral facility, Three diverse fiber entry points, Two Meet-Me-Rooms, Multiple Tier-1 carriers including Cogent, Comcast, FiberLight, Level 3, Verizon Virginia, and Zayo, Direct connectivity to major cloud providers, application providers, and enterprise ecosystem