Skip to main content

General Information

Provider

Digital Realty

Colo Space

64,000 SF

Airport

N/A

Year Built

2020

Security

On-site

Uptime

N/A

Hyperscale

Not Enabled

Retail

Available

Wholesale

Available

Interconnectivity

Available

Overview

Chosen for its strategic location, Mexico is the newest country where Ascenty is building two major data centers. Combined, Mexico's data centers have 52 MW in power capacity and 473,000 square meters of floor space. In addition to the high quality and redundancy of the infrastructure, the data centers offer excellence in connectivity, with a dedicated fiber optic network or connection with carriers.

Certifications

Tier III Design
Tier III Facility
TR3
Financial transactions
ISO 27001
ISO 9001
ISO 14001
ISO 50001

Power & Infrastructure

Power Density

N/A

Utility Feeders

N/A

UPS

Tri-bus redundancy system

Standby Power

Dual diesel fuel storage tanks (48 hours of fuel autonomy without refueling)

Cooling

Dual coil cold water chiller system (Isolated technical corridors for equipment maintenance)

Flood Zone

N/A

Seismic Rating

N/A

Fire Suppression

N/A

Fire Detection

N/A

Amenities

  • Racks
  • Cages
  • Smart Hands
  • Work Areas
  • Disaster Recovery
  • Carrier Neutral
  • 52 MW total power capacity

Other Information

Network Providers

Carrier Neutral, Dedicated Telecom meet me rooms, Direct connection with PIX México 1 and PIX México 2

Media

No media available.

Contact Querétaro Data Centers

Complete the form to get your information reviewed by Querétaro Data Centers