Data Center Map Colocation Bare Metal Facilities Regions Providers Quotes Contact

General Information

Overview

DataBank's DFW9 will be the first of eight, 2-story data centers with 200,000 Sq. Ft. of data center space. The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station that can deliver up to 240MW of critical IT power with ability to increase this in Phase 2 for a total of 480MW across all 8 buildings. This site will feature DataBank's Universal Data Hall Design and be HPC-ready with the ability to support rear door heat exchangers and servers supporting water-to-chip cooling.

Certifications

No certifications available. See Provider Certifications.

Building Details

Network Providers

6 On-Site Network Providers

Internet Exchange Partner

Cloud Connectivity Partner

Managed Internet Connectivity

Metro & National Data Center Interconnect

Amenities

No amenities listed

Media

No media available. See DataBank Media.

Contact

Complete the form to get in your information reviewed by

Get Started Today

Register Your Email Address with ColoCapacity

{}
{"_geo": {"lat": 32.534689, "lng": -96.746249}, "amenities": ["Cabinets \u0026 Cages", "HPC Capable", "In-Metro DataBank Cloud", "In-Metro FedRAMP Cloud", "Special Request Remote Hands", "Special Request Smart Hands"], "certifications": ["NULL"], "facility": {"address": "Batchelor and Stainback Rd.", "city": "Red Oak", "connectivity": {"hasHyperscale": true, "hasInterconnect": true, "hasRetail": true, "hasWholesale": true, "networkProviders": ["6 On-Site Network Providers", "Internet Exchange Partner", "Cloud Connectivity Partner", "Managed Internet Connectivity", "Metro \u0026 National Data Center Interconnect"]}, "country": "United States", "name": "Red Oak DFW9 Data Center", "overview": "DataBank\u0027s DFW9 will be the first of eight, 2-story data centers with 200,000 Sq. Ft. of data center space. The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station that can deliver up to 240MW of critical IT power with ability to increase this in Phase 2 for a total of 480MW across all 8 buildings. This site will feature DataBank\u0027s Universal Data Hall Design and be HPC-ready with the ability to support rear door heat exchangers and servers supporting water-to-chip cooling.", "state": "Texas", "stateAbbr": "TX", "url": "/databank-red-oak-data-center", "worldRegion": "northamerica", "yearBuilt": "NULL", "zipcode": "75154"}, "hasSecurity": true, "id": 1403, "media": ["NULL"], "powerAndCooling": {"cooling": {"configuration": "N+1", "redundancy": "N+1"}, "density": "30kW+ (Air), 100kW+ (Liquid)", "standbyPower": {"configuration": "NULL", "redundancy": "NULL"}, "ups": {"configuration": "N+1", "redundancy": "N+1"}, "utilityFeeders": "NULL"}, "priority": 1, "provider": "DataBank", "providerId": 9, "providerLogo": "https://colo.nyc3.cdn.digitaloceanspaces.com/logos/databank.png", "specifications": {"building": {"colocationSpace": 200000, "type": "NULL"}, "fireProtection": {"detection": "NULL", "suppression": "NULL"}, "floodAndSeismic": {"floodZone": "NULL", "seismicRating": "NULL"}}, "uptime": "100%"}