Skip to main content

General Information

Provider

CyrusOne

Colo Space

25,266 SF

Airport

N/A

Year Built

N/A

Security

On-site

Uptime

99.999% reliability with the ability for concurrent maintainability

Hyperscale

Enabled

Retail

Available

Wholesale

Available

Interconnectivity

Available

Overview

CyrusOne FRA7 is a brand-new state of-the-art data center campus strategically located in FRANKFURT WESTSIDE; Frankfurt's largest 73-hectare commercial and industrial mixed-use regeneration project managed by BEOS AG and Swiss Life Asset Managers Deutschland GmbH. The facility will initially deliver 81 MW IT capacity to 25,266 sqm (271,964 sq ft) of world class technical space within two separate three-story buildings.

Certifications

ISO 14001 Environmental Management
ISO 27001 Information Security Management
ISO 9001 Quality Management
ISO 50001 Energy Management
Designed to achieve BREEAM Very Good certification as a minimum

Power & Infrastructure

Power Density

N/A

Utility Feeders

81 MW IT capacity

UPS

Block redundant UPS topology with 1500KW UPS system per power stream (9 MW block redundant topology with 7 independent and compartmentalized power blocks per data hall)

Standby Power

Fully rated block redundant LV back-up generators with 48-hour fuel autonomy, capable of continuous running, paired with each power stream (Block redundant)

Cooling

Critical cooling distributed via multiple pipework rings per data hall for maximum resilience (N+1 free cooling air cooled chillers, Computer Room Air Handing Units at N+4, Chilled Water Circulation pumps N+1)

Flood Zone

N/A

Seismic Rating

N/A

Fire Suppression

Three-stage fire detection systems, VESDA, Nitrogen filled pre-action sprinkler system to data halls and MMR's

Fire Detection

Three-stage fire detection systems, VESDA, Fire detection in all rooms, in air plenums and in voids

Amenities

  • Capable of deploying a potential 40MW of waste heat for re-use across the wider campus heating network when at full capacity
  • Utilization of 100% renewable energy sources
  • 150MVA utility power supply at 110kV
  • New redundant high-voltage grid connection and a dedicated substation serving the data centers
  • PV cells on the roof to generate power for the office areas and other ancillary spaces
  • Low PUE (<1.3) achieved through highly efficient design and equipment selections
  • Low WUE achieved through utilization of closed loop chilled water system and no evaporative cooling
  • Multi-layer industry-leading levels of physical and electronic security with 24/7 year-round onsite support
  • The data centers will be capable of deploying up to 40MW of waste heat for re-use across the wider campus heating network when at full capacity
  • Integration of PV cells to contribute towards office power supplies and other ancillary spaces
  • To reduce NOX emissions, all generators are provided with Selective Catalytic Reduction (SCR) systems and can run on HVO fuels
  • Provision of 5,500 sqm of open green space and the planting of over sixty trees
  • Over 1,800 sqm of the facility walls and roofs will be 'green'

Other Information

Network Providers

Carrier neutrality and diverse fiber connectivity to site, Four diverse fiber routes onto site, Diverse fiber rings around entire facility to permit multiple building/hall connectivity

Media

No media available.

Contact Frankfurt - WESTSIDE FRA7 Data Center

Complete the form to get your information reviewed by Frankfurt - WESTSIDE FRA7 Data Center