General Information
Provider
Evoque Data Centers
Colo Space
154,158 SF
Airport
N/A
Year Built
1985
Security
On-site
Uptime
N/A
Hyperscale
Not Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Available
Overview
Operated by Evoque Data Centers, this Mesa facility is located at 1301 West University Boulevard. The 154,158 SF retrofit facility is designed to meet customer colocation needs. On the interconnectivity side, the facility offers connections to on-net fiber providers including PCCW Global, AboveNet and CenturyLink. The UPS systems are N+1 redundant and the generators are N+1 redundant.
Certifications
Power & Infrastructure
Utility Feeders
Dual Feed
UPS
Four (4) UPS systems, each with two (2) 675kW/750kVA modules; three systems act as primary source of power and the fourth system works as standby system; each UPS system can support designed full load of 1350kW 1500kVA (each) for 15 minutes via internal battery plant (N+1)
Standby Power
N+1
Cooling
N+1
Other Information
Network Providers
Cogent Communications, CenturyLink (Lumen), AboveNet, Cox Enterprises, Megaport, Integra Telecom, Hudson Fiber, Cloudflare, PCCW Global, MCImetro Access Transmission Services, Kyndryl