22715 Relocation Drive
Building | --- | Power | --- |
---|---|---|---|
Year Built: | 2023 | On Site Substation | No |
Purpose Built or Retrofit | Purpose Built | Single or Dual Feed | Dual Feed |
Building Size | 430,000 SF | Market Avg Power Cost | 6.85 |
Building Owner: | Aligned Data Centers | Power Provider | --- |
UPS | null, TBD based on development | Generator | --- | Cooling | --- |
---|
SSAE-16 | --- | SSAE-18 | --- | HIPPAA | --- |
---|---|---|---|---|---|
PCI | --- | DIACAP | --- | Energy Star | --- |
ISO | --- | FISMA | --- | FEDRAMP | --- |
NIST | --- | SOC 1 | --- | SOC 2 | --- |
SOC 3 | --- | Uptime Institute MO Site Award | --- | Uptime Institute Tier III Constructed | --- |
Uptime Institute Tier III Design | --- |
Private Suites | --- | Cloud | --- |
---|---|---|---|
Dedicated Infrastructure | --- | SLA 99% | --- |
CCTV | --- | Card Key Access | --- |
---|---|---|---|
Man Trap | --- | Perimeter Fencing | --- |
AWS Direct Connect |
Google Cloud |
Microsoft Azure ExpressRoute |
Oracle Cloud |